Engineering Assistance for Demolition

Catalyst Paper Corporation
Powell River, British Columbia
Project Year: 2008

This project involved the demolition of a portion of the old steam plant at the Catalyst Mill in Port Alberni. MG's work included preparation of scope packages, scheduling assistance, design of new bracing and floor steel, inspection of damage caused by the demolition Contractor, provision of repair details to damaged columns and beams, and general engineering support.