Pulp Warehouse Expansion

Catalyst Paper Corporation
Powell River, British Columbia
Project Year: 2003

The project included the design of a large covered loading bay for the storage and unloading of baled pulp from railcars.
The work included liaison with mill crews to determine the best arrangement, and preparation of a detailed construction budget. The detailed design was also carried out by MG. This involved the design of foundations, ramps, and the layout of the pre-engineered cover.

The engineering work included the preparation of contract documents, preparation of comparison of tenders and site inspections.